The dock to ground ramps serve as entry and exit ramps for handling equipment. The ramps are designed for assembly in the loading and unloading terminal.
L = length
H = loading height
C = climb percentage 30 %
For safety reasons, do not exceed a maximum slope of 30% = 16.5 degrees.